A De-Risked Pathway to a U.S. Supply Chain

  Our strategy adapts the proven, successful models of our neighbors to create a phased, credible, and bankable development plan from mine to U.S. market, leveraging major World Bank-funded infrastructure. 


 

 

Step 1: Bankable Feasibility Study (BFS)

Timeline: 12-15 Months / Est. Cost: ~$3.6M Conduct a 10,000-meter drilling program, benchmarked against successful regional campaigns, to produce a definitive, bankable resource estimate.

This comprehensive study will include:

  • Detailed Resource Definition (infill drilling, metallurgical test work)
  • Mining Engineering (pit design, schedule, equipment selection)
  • Process Engineering (flowsheet optimization, plant design)
  • Infrastructure Design (power, water, roads – though RN10 
  • Environmental & Social Impact Assessment (ESIA) – crucial for permitting and due diligence.
  • Economic Analysis (OPEX/CAPEX estimation, financial modeling)
  • Market Studies (off-take, product specifications)


Step 2: Phase 1 "Bonanza Module" & U.S. Anode Plant

Timeline: 18-24 Months / Est. CAPEX: ~$25-30M

 Construct a low-cost, modular "starter" mine in Madagascar, fed by our ultra-high-grade ore. In parallel, construct a processing plant in the U.S. to convert this concentrate into battery-ready anode material, generating early cash flow and onshoring the most critical part of the supply chain.


Step 3: Full-Scale Production

Timeline: Years 3-5+

 Leverage cash flow from Phase 1 to develop the full district-scale resource in Madagascar, supplying the operational U.S. anode facility and establishing a fully integrated, secure American supply chain aligned with U.S. policies and programs such as DFC and EXIM. 

Disclaimer about Forward-Looking Statements & Imagery

Disclaimer: 

Some images and visual representations on this site, particularly regarding future projects or developments (e.g., Ampanihy Crown Mine), are conceptual renderings and not actual photographs of existing facilities. They are intended for illustrative purposes only to depict potential plans and aspirations. 

 

Important Disclosures: 

Forward-looking statements, imagery, and other legal notices. 

 [Link to our legal page here] 

Copyright © 2025 Liberty Graphite - All Rights Reserved.

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept